The Schoharie Basin Project Summary provides information on a selection of full channel stream restoration, stormwater and infrastructure, riparian buffer restoration, streambank stabilization, and floodplain restoration projects that have been completed since 1999 as part of the Schoharie Basin Stream Management Program. Projects were constructed to meet multiple objectives including: water quality enhancement, infrastructure protection, improved flood conveyance and sediment transport, improved fish habitat, improved riparian functions and natural channel design demonstrations.
These projects constitute one component of the NYC Department of Environmental Protection and Greene County Soil and Water Conservation District’s stream management program.
For additional programming and grant opportunities visit Schoharie Watershed Advisory Committee. Information on projects not included on this map may be accessed from the table at the bottom of the page. For more information, or if you are interested in volunteering, please contact Abbe Martin at (518) 622-3620 or abbe@gcswcd.com.
Schoharie Watershed: Featured Projects
[iframe src=”http://www.catskillstreams.org/projectmaps/schoharie/index.html” width=”100%” height=”650″]
Schoharie Watershed: Projects and Programs
Basin | Project Name | SubBasin | County | Municipality | Project Type | Project Sponsor | Lead Agency | DEP Fund | Match Fund | DEMONSTRAT | DESCRIPTIO | Status | Year Complete | YEAR_INITI | Total Cost | DEP Cost | Length (Feet) | Area (Acres) | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Schoharie | 2010 Schoharie Watershed Week | Schoharie | Greene | Basin | Education and Outreach | GCSWCD | GCSWCD | SMIP | No | A week long series of events, activities, and workshops for people of all ages to learn about the Schoharie Watershed, its resources, and programs available for water quality protection. | Completed | 2010 | 2010 | $5,100 | $5,100 | ||||
Schoharie | Batavia Kill SMP | Batavia Kill | Greene | Windham | Planning | NYCDEP | GCSWCD | Contract | Yes | Stream Management Planning | Completed | 2003 | In house | In house | |||||
Schoharie | Batavia Kill, A CSBI | Batavia Kill Headwaters | Greene | Town of Windham | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2010 | 2010 | In house | In house | 100 | 0.057 | ||
Schoharie | Batavia Kill, Ashland Connector | Batavia Kill_Sch | Greene | Town of Ashland | Full Channel Restoration | NYCDEP | GCSWCD | Contract | No | Completed | 2006 | 0 | $1,005,514 | $1,005,514 | 3400 | 26 | |||
Schoharie | Batavia Kill, Ashland Connector Irene Repair | Batavia Kill | Greene | Town of Ashland | Full Channel Restoration | NYCDEP | GCSWCD | Contract | FEMA | No | Irene Repair | Design | 2011 | $208,390 | $52,098 | 1050 | |||
Schoharie | Batavia Kill, Ashland Wells | Batavia Kill | Greene | Town of Ashland | Streambank Stabilization | Ashland | GCSWCD | Contract | EWP-ESD | No | EWP Project | Completed | 2013 | 2011 | $641,400 | $160,350 | 1100 | 3.9 | |
Schoharie | Batavia Kill, Big Hollow | Batavia Kill Headwaters | Greene | Town of Windham | Full Channel Restoration | NYCDEP | GCSWCD | Contract | No | Completed | 2002 | 0 | $646,473 | $646,473 | 5130 | 43 | |||
Schoharie | Batavia Kill, Big Hollow Irene Repair | Batavia Kill | Greene | Town of Windham | Full Channel Restoration | NYCDEP | GCSWCD | Contract | FEMA | No | Irene Repair | Design | 2011 | $162,863 | $40,716 | 700 | |||
Schoharie | Batavia Kill, Brandywine | Batavia Kill_Sch | Greene | Town of Windham | Full Channel Restoration | NYCDEP | GCSWCD | Contract | No | Completed | 1999 | 0 | $157,115 | $157,115 | 3800 | 8.3 | |||
Schoharie | Batavia Kill, Brandywine Irene Repair | Batavia Kill | Greene | Town of Windham | Full Channel Restoration | NYCDEP | GCSWCD | Contract | FEMA | No | Irene Repair | Design | 2011 | $426,439 | $106,610 | 3800 | 8.3 | ||
Schoharie | Batavia Kill, Conine | Batavia Kill_Sch | Greene | Town of Prattsville | Full Channel Restoration | NYCDEP | GCSWCD | Contract | No | Completed | 2007 | 0 | $974,419 | $974,419 | 1650 | 8.13 | |||
Schoharie | Batavia Kill, Conine Irene Repair | Batavia Kill_Sch | Greene | Town of Prattsville | Full Channel Restoration | NYCDEP | GCSWCD | Contract | FEMA | No | Irene Repair | Completed | 2013 | 2012 | $871,987 | $217,997 | 1650 | 8.13 | |
Schoharie | Batavia Kill, H CSBI | Batavia Kill | Greene | Town of Windham | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | Completed | 2012 | 2012 | In house | In house | 1580 | 1.9 | ||||
Schoharie | Batavia Kill, H. | Higgins | Batavia Kill | Greene | Town of Windham | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | Completed | 2013 | 2013 | 68 | 68 | 160 | 0 | |||
Schoharie | Batavia Kill, Hensonville Debris Removal Project | Batavia Kill | Greene | Town of Windham | Hazard Mitigation | NYCDEP | GCSWCD | Grant | No | removal of debris accumulation caused by the flooding during Hurricane Irene | Completed | 2011 | 2011 | $124,436 | $124,436 | 8976 | |||
Schoharie | Batavia Kill, Kan. CSBI | Batavia Kill_Sch | Greene | Town of Ashland | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2009 | 2009 | In house | In house | 200 | 0.23 | ||
Schoharie | Batavia Kill, Kas. CSBI | Batavia Kill_Sch | Greene | Town of Ashland | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2009 | 2009 | In house | In house | 3000 | 7.1 | ||
Schoharie | Batavia Kill, M CSBI | Silver Lake | Greene | Town of Windham | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2009 | 2009 | In house | In house | 150 | 0.17 | ||
Schoharie | Batavia Kill, M. Phase 2 | Mayo_Phase 2 | Batavia Kill | Greene | Town of Windham | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | Completed | 2013 | 2013 | 66 | 66 | 200 | 0 | |||
Schoharie | Batavia Kill, Maier Farm | Batavia Kill_Sch | Greene | Town of Ashland | Full Channel Restoration | NYCDEP | GCSWCD | Contract | No | Completed | 1999 | 0 | $187,519 | $187,519 | 1650 | 6.48 | |||
Schoharie | Batavia Kill, Maier Farm Irene Repair | Batavia Kill_Sch | Greene | Town of Ashland | Full Channel Restoration | NYCDEP | GCSWCD | Contract | FEMA | No | Irene Repair | Completed | 2013 | 2012 | $272,908 | $68,227 | 800 | 3.1 | |
Schoharie | Batavia Kill, Partridge Road Culvert | Sutton Hollow | Greene | Town of Ashland | Stormwater and Infrastructure | Locally | GCSWCD | SMIP | FEMA | No | Completed | 2011 | 2009 | $51,973 | $51,973 | ||||
Schoharie | Batavia Kill, Restoration at Holden | Batavia Kill | Greene | Town of Ashland | Full Channel Restoration | DEP | GCSWCD | Contract and SMIP | FEMA | No | Full channel | Completed | 2013 | 2010 | $1,166,114 | $1,166,114 | 3500 | 16 | |
Schoharie | Batavia Kill, Sugar Maples 1 | Batavia Kill Headwaters | Greene | Town of Windham | Stormwater and Infrastructure | Locally | GCSWCD | Contract | WRDA | No | Completed | 2009 | 2007 | In house | In house | 4.7 | |||
Schoharie | Batavia Kill, Sugar Maples 2 | Batavia Kill Headwaters | Greene | Town of Windham | Full Channel Restoration | Locally | GCSWCD | Contract | WRDA | No | Completed | 2009 | 0 | In house | In house | 550 | 1.4 | ||
Schoharie | Batavia Kill, Sugar Maples 3 | Batavia Kill Headwaters | Greene | Town of Windham | Riparian Buffer Planting | NYCDEP | GCSWCD | Contract | WRDA | No | Completed | 2008 | 2007 | In house | In house | 370 | 0.3 | ||
Schoharie | Batavia Kill, Suttons | Sutton Hollow | Greene | Town of Ashland | Riparian Buffer Planting | Locally | GCSWCD | Contract | WRDA | No | Completed | 2007 | 2007 | In house | In house | 30 | 0.007 | ||
Schoharie | Batavia Kill, Windham Country Club | Batavia Kill_Sch | Greene | Town of Windham | Streambank Stabilization | Locally | GCSWCD | Contract | CWC | No | CWC Program | Completed | 2009 | 2008 | $100,000 | In house | 105 | 0.14 | |
Schoharie | Batavia Kill, Windham Mountain | Batavia Kill | Greene | Town of Windham | Stormwater and Infrastructure | Locally | GCSWCD | Contract | WRDA | Yes | Completed | 2010 | 2007 | $973,737 | $92,146 | 39 | |||
Schoharie | Batavia Kill, Windham Path multi-use | Batavia Kill | Greene | Windham | Recreation | Windham | GCSWCD | SMIP | Windham | No | Assist the Town of Windham in creating a 1.1 mile multi-use loop trail on a 68-acre parcel owned by the Town. The trail will create access to the Batavia Kill. Bridge and boardwalk materials are needed to construct the multi-use, non-motorized trail on the Police Anchor Camp (town property) which will cross over a wetland and a tributary and open an access point to the Batavia Kill. | Completed | 2013 | 2011 | $15,000 | $15,000 | |||
Schoharie | Batavia Kill, Windham Wells | Batavia Kill | Greene | Town of Windham | Streambank Stabilization | Windham | GCSWCD | Contract | EWP-ESD | Completed | 2013 | 2011 | $69,930 | $17,482 | 300 | ||||
Schoharie | Brandow_Final Phase | Manor Kill | Greene | Town of Conesville | Riparian Buffer Planting | NYCDEP | SCSWCD | CSBI | Completed | 2012 | 2012 | In house | In house | 200 | 0.11 | ||||
Schoharie | CD Lane Family Day | Batavia Kill | Greene | Windham | Education and Outreach | GCSWCD | GCSWCD | SMIP | Community of Windham Foundation | No | Promote outdoor activities as part of CD Lane Family Day that involve hands on experience involving water activities (fly fishing demos, canoe & kayak safety class, nature hike and crafts) | Completed | 2011 | 2011 | $630 | $630 | |||
Schoharie | Cranberry Road Culvert | Schoharie Creek Headwaters | Greene | Town of Hunter | Stormwater and Infrastructure | NYCDEP | GCSWCD | SMIP | No | Design | 2013 | 2010 | $12,715 | $12,715 | |||||
Schoharie | Creamery Pond Stormwater | Batavia Kill | Greene | Town of Windham | Stormwater and Infrastructure | Windham | Completed | 2012 | 0 | $203,057 | |||||||||
Schoharie | East Kill SMP | East Kill | Greene | Jewett | Planning | NYCDEP | GCSWCD | Contract | Yes | Stream Management Planning | Completed | 2006 | 2006 | In house | In house | ||||
Schoharie | East Kill, Apple Hill K/R | East Kill | Greene | Town of Jewett | Full Channel Restoration | Jewett | GCSWCD | SMIP | EWP-ESD | No | Completed | 2013 | 2011 | $349,880 | $95,504 | 1400 | 5 | ||
Schoharie | East Kill, Apple Hill Nik | East Kill | Greene | Town of Jewett | Full Channel Restoration | Jewett | GCSWCD | Contract and SMIP | EWP-ESD | Completed | 2013 | 2011 | $805,617 | $320,157 | 1800 | 5 | |||
Schoharie | East Kill, Bar. CSBI | East Kill | Greene | Town of Jewett | Riparian Buffer Planting | GCSWCD | CSBI | No | Destroyed in 2011 Flood | Completed | 2011 | 2011 | In house | In house | 0.68 | ||||
Schoharie | East Kill, Ben. CSBI | East Kill | Greene | Town of Jewett | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | Completed | 2012 | 2012 | In house | In house | 300 | 0.1 | ||||
Schoharie | East Kill, CS CSBI | East Kill | Greene | Town of Jewett | Riparian Buffer Planting | GCSWCD | CSBI | Completed | 2011 | 2011 | In house | In house | 950 | 2.18 | |||||
Schoharie | East Kill, Curtain Riparian Project | East Kill | Greene | Town of Jewett | Riparian Buffer Planting | Locally | GCSWCD | Contract | No | Completed | 2007 | 0 | $75 | $75 | 80 | 0.01 | |||
Schoharie | East Kill, D CSBI | East Kill | Greene | Town of Jewett | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2010 | 2010 | In house | In house | 300 | 0.68 | ||
Schoharie | East Kill, D. Phase 2 Repair | Dodson_Phase 2 Repair | East Kill | Greene | Town of Jewett | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | Completed | 2013 | 2013 | 0 | 0 | 300 | 1 | |||
Schoharie | East Kill, Farber Farm | East Kill | Greene | Town of Jewett | Full Channel Restoration | Locally | GCSWCD | Contract | NRCS | No | Completed | 1999 | 0 | $135,564 | $135,564 | 2400 | 4.5 | ||
Schoharie | East Kill, Rap. CSBI | East Kill | Greene | Town of Jewett | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2010 | 2010 | In house | In house | 200 | 0.34 | ||
Schoharie | East Kill, Riv. CSBI | East Kill | Greene | Town of Jewett | Riparian Buffer Planting | GCSWCD | CSBI | No | Destroyed in 2011 Flood | Completed | 2011 | 2011 | In house | In house | 1.08 | ||||
Schoharie | East Kill, Shadow Mountain | East Kill | Greene | Town of Jewett | Riparian Buffer Planting | Locally | GCSWCD | Contract | Other | No | Completed | 2007 | 0 | $3,230 | $3,230 | 60 | 0.06 | ||
Schoharie | East Kill, Vista Ridge | East Kill | Greene | Town of Jewett | Full Channel Restoration | NYCDEP | GCSWCD | SMIP | No | Completed | 2011 | 2009 | $378,699 | $150,000 | 2400 | ||||
Schoharie | Glen Avenue Culvert | Schoharie Creek Headwaters | Greene | Village of Hunter | Stormwater and Infrastructure | NYCDEP | GCSWCD | SMIP | No | Design | 2014 | 2011 | $4,728 | $4,728 | |||||
Schoharie | Gooseberry Creek, Project Office | Schoharie Creek Headwaters | Greene | Village of Tannersville | Stormwater and Infrastructure | Locally | GCSWCD | Contract | WRDA | Yes | Completed | 2010 | 2008 | $205,793 | 1.2 | ||||
Schoharie | Gooseberry Creek, Tannersville | Schoharie Creek Headwaters | Greene | Town of Hunter | Full Channel Restoration | Locally | GCSWCD | Contract | No | Completed | 2007 | 2001 | NA | In house | 400 | 0.15 | |||
Schoharie | Griffin Rd Culvert Replacement | East Kill | Greene | Town of Jewett | Stormwater and Infrastructure | Jewett | Jewett | Contract and SMIP | FEMA | No | FEMA Repair | Completed | 2012 | 2011 | $34,712 | $17,005 | 200 | ||
Schoharie | Huntersfield Creek, D. | Donnelly | Huntersfield Creek | Greene | Town of Windham | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | Completed | 2013 | 2013 | 163 | 163 | 250 | 0 | |||
Schoharie | Huntersfield Creek, W. | Wilkie | Huntersfield Creek | Greene | Town of Windham | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | Completed | 2013 | 2013 | 19 | 19 | 150 | 0 | |||
Schoharie | Johnson Hollow Brook, VanValkenburg Farm | Johnson Hollow Brook | Delaware | Town of Roxbury | Streambank Stabilization | NYCDEP | DCSWCD | Contract | DEP | No | CREP bank stabilization, constructed riffles, floodplain bench, Ag program designed | Completed | 2012 | 2011 | $35,984 | $35,984 | 1050 | 0.9 | |
Schoharie | Kozak Stream Restoration | Schoharie Creek Headwaters | Greene | Town of Jewett | Streambank Stabilization | GCSWCD | SMIP | Incomplete | Planned | 2014 | 2010 | $150,000 | $150,000 | ||||||
Schoharie | Lexington LFHMA | Schoharie | Greene | Lexington | Hazard Mitigation | GCSWCD | GCSWCD | SMIP | No | Flood Hazard Analysis | In-Process | 2013 | $49,850 | $49,850 | |||||
Schoharie | Lexington Pocket Stream Access Park | Schoharie | Greene | Lexington | Recreation | Lexington | GCSWCD | SMIP | Lexington | No | Enhance public access of the Schoharie Creek by creating a park setting with a low impact trail and educational material. | Completed | 2013 | 2012 | $4,200 | $4,200 | |||
Schoharie | M. Residence Bank Stabilization | Schoharie | Greene | Hunter | Planning | GCSWCD | GCSWCD | SMIP | No | Hire engineer to conduct a geotechnical assessment of the failing streambank and to develop a conceptual stabilization strategy. The application was also submitted to obtain funding for temporary seeding and mulching of the damaged streambank. | Completed | 2010 | 2010 | $15,000 | $15,000 | ||||
Schoharie | Manor Kill Acquisition 25% cost share | Manor Kill | Greene | Conesville | Hazard Mitigation | SCPD | GCSWCD | SMIP | FEMA | No | The Town of Conesville wants to assist a landowners by acquiring a floodplain parcel approved for Pre-Disaster Mitigation funding (75%) and demolishing and removing the home. The Town needs assistance with the 25% match | Completed | 2013 | 2011 | $138,587 | $9,413 | |||
Schoharie | Manor Kill Environmental Study Team | Manor Kill | Greene | Conesville | Education and Outreach | Schoharie River Center | GCSWCD | SMIP | None | No | Work towards implementation of Manor Kill SMP by involving youth, and their families, in water quality monitoring and testing, taxonomy, riparian zone restoration, invasive species identification, and public outreach presentation skill building | Completed | 2012 | 2010 | $5,000 | $5,000 | |||
Schoharie | Manor Kill Information Kiosk | Manor Kill | Greene | Conesville | Education and Outreach | GCSWCD | SCSWCD | SMIP | None | No | Create a kiosk highlighting the Manor Kill, watershed protection efforts, and agencies and programs serving the area. Location would be in a popular public park, near a riparian planting project that took place in Oct. 2008. | Completed | 2011 | 2010 | $1,833 | $1,833 | |||
Schoharie | Manor Kill SMP | Manor Kill | Greene | Conesville | Planning | NYCDEP | GCSWCD | Contract | Yes | Stream Management Planning | Completed | 2008 | 2009 | In house | In house | ||||
Schoharie | Manor Kill, B CSBI | Manor Kill | Greene | Town of Conesville | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | No | Completed | 2010 | 2010 | In house | In house | 50 | 0.07 | |||
Schoharie | Manor Kill, C CSBI | Manor Kill | Greene | Town of Conesville | Riparian Buffer Planting | NYCDEP | SCHC_SWCD | CSBI | WRDA | No | Completed | 2010 | 2009 | In house | In house | 1716 | 2.91 | ||
Schoharie | Manor Kill, C Final Phase CSBI | Manor Kill | Greene | Town of Conesville | Riparian Buffer Planting | NYCDEP | SCSWCD | CSBI | Completed | 2012 | 2012 | In house | In house | 900 | 1 | ||||
Schoharie | Manor Kill, Gen. CSBI | Manor Kill | Greene | Town of Conesville | Riparian Buffer Planting | NYCDEP | SCHC_SWCD | CSBI | WRDA | No | Completed | 2009 | 2009 | In house | In house | 550 | 0.94 | ||
Schoharie | Manor Kill, Gro. CSBI | Manor Kill | Greene | Town of Conesville | Riparian Buffer Planting | NYCDEP | SCHC_SWCD | CSBI | WRDA | No | Completed | 2009 | 2009 | In house | In house | 240 | 0.28 | ||
Schoharie | Manor Kill, Mat. CSBI | Manor Kill | Greene | Town of Conesville | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2010 | 2010 | In house | In house | 100 | 0.14 | ||
Schoharie | Manor Kill, May. CSBI | Batavia Kill | Greene | Town of Windham | Riparian Buffer Planting | GCSWCD | CSBI | Completed | 2012 | 2012 | In house | In house | 200 | 0.1 | |||||
Schoharie | Manor Kill, Q CSBI | Manor Kill | Greene | Town of Conesville | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2010 | 2010 | In house | In house | 500 | 0.52 | ||
Schoharie | Manor Kill, Town Hall Planting | Manor Kill | Greene | Town of Conesville | Riparian Buffer Planting | Locally | SCHC_SWCD | Contract | WRDA | No | Completed | 2008 | 0 | In house | In house | 235 | 0.32 | ||
Schoharie | Mitchell Hollow Stormwater | Batavia Kill | Greene | Town of Windham | Stormwater and Infrastructure | Windham | SMIP | Design | 2014 | 2011 | NA | $75,000 | |||||||
Schoharie | Mitchell Hollow, B CSBI | Mitchell Hollow | Greene | Town of Windham | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2010 | 2010 | In house | In house | 30 | 0.01 | ||
Schoharie | Mountain Top Arboretum Outdoor Classroom | Schoharie | Greene | Tannersville | Education and Outreach | GCSWCD | GCSWCD | SMIP | Mtn Top Arboretum | No | The project includes construction of an outdoor classroom that will accommodate approximately 45 people for year-round outdoor programming on a range of ecological and natural history topics relating to the watershed. | Completed | 2012 | 2011 | $34,180 | $25,000 | |||
Schoharie | Mountaintop Better Site Design Plan Workshops | Schoharie | Greene | Basin | Planning | GCSWCD | GCSWCD | SMIP | No | Guide each community through a comparison of the local codes against model development principles using a consensus building approach. A $50,000 CWC LTAP grant was submitted to cover the majority of this project. | Completed | 2012 | 2010 | $62,000 | $12,000 | ||||
Schoharie | Mountaintop HWY Re-vegetation Program | Schoharie | Greene | Basin | Stormwater and Infrastructure | SWAC Highway Subcommittee | GCSWCD | SMIP | No | This program proposes an organized approach to working with local, county, and state highway departments to encourage greater use of critical area seeding equipment that the GCSWCD has available for the highway departments. | In-Process | 2013 | 2011 | $12,000 | $12,000 | ||||
Schoharie | Mountaintop Library Stormwater Project | Schoharie | Greene | Tannersville | Stormwater and Infrastructure | Tannersville | GCSWCD | SMIP | CWC-ACOE | No | The project serves to measurably improve water quality, as well as reduce quantity and improve conveyance of stormwater runoff from a property owned by the Haines Falls Free Public Library. This retrofit project will be performed in conjunction with the redevelopment of an existing building for use as the new Mountain Top Library & Learning Center, and is being redeveloped according to Leadership in Energy & Environmental Design (LEED) certification standards. | Completed | 2011 | 2010 | NA | $44,975 | |||
Schoharie | Mountaintop Sweeper and Vacuum truck | Schoharie | Greene | Basin | Stormwater and Infrastructure | GCSWCD | GCSWCD | SMIP | CWC | No | Currently eight municipalities in Greene County that are within the Schoharie Watershed are using one sweeper/vacuum truck to maintain 626 lane miles of roadway. The size of this geographic area, along with the miles of roadway that this one piece of equipment must service, and the limited time frame that this important work needs to be accomplished, makes this an extremely difficult task to undertake. Application is match for CWC funding. | Design | 2010 | $40,000 | $40,000 | ||||
Schoharie | N. Settlement Creek, C CSBI | North Settlement Creek | Greene | Town of Ashland | Riparian Buffer Planting | GCSWCD | CSBI | No | Completed | 2011 | 2011 | In house | In house | 1000 | 1.56 | ||||
Schoharie | North Settlement Creek, H CSBI | North Settlement Creek | Greene | Town of Ashland | Riparian Buffer Planting | GCSWCD | CSBI | No | Completed | 2011 | 2011 | In house | In house | 350 | |||||
Schoharie | Oakwood Pistol Club | Batavia Kill | Greene | Town of Prattsville | Streambank Stabilization | Locally | GCSWCD | Contract | CWC | No | CWC Program | Completed | 2009 | 2008 | $99,200 | In house | 138 | 0.11 | |
Schoharie | Prattsville Floodplain Restoration Project | Schoharie Creek | Greene | Town of Prattsville | Floodplain Restoration | Locally | GCSWCD | Contract | Other | No | Completed | 2004 | 0 | $156,622 | In house | 2200 | 2.5 | ||
Schoharie | Rain Barrel Workshop | Schoharie | Greene | Basin | Education and Outreach | Greene CCE | GCSWCD | SMIP | None | No | Conduct a hands-on educational workshop on building rain barrels as part of the Schoharie Watershed Week program (raising awareness about water quality stewardship). The Workshop will provide materials, instruction for approximately 10 families, the goal of which is to introduce participants to methods of stormwater control, non-point source pollution prevention and conservation of water resources in a residential setting | Completed | 2010 | 2010 | $1,884 | In house | |||
Schoharie | Schoharie Creek SMP | Schoharie | Greene | Basin | Planning | NYCDEP | GCSWCD | Contract | Yes | Stream Management Planning | Completed | 2006 | 2006 | In house | In house | ||||
Schoharie | Schoharie Creek, Carr Road | Schoharie Creek Headwaters | Greene | Town of Jewett | Riparian Buffer Planting | NYCDEP | GCSWCD | Contract | WRDA | No | Completed | 2008 | 2007 | $17,709 | $16,319 | 1200 | 2.8 | ||
Schoharie | Schoharie Creek, Deming | Schoharie Creek Headwaters | Greene | Town of Jewett | Riparian Buffer Planting | NYCDEP | GCSWCD | Contract | WRDA | No | Completed | 2009 | 0 | In house | In house | 998 | 1.5 | ||
Schoharie | Schoharie Creek, Falke Road | Schoharie Creek | Greene | Town of Lexington | Riparian Buffer Planting | Locally | GCSWCD | Contract | FEMA | No | Completed | 2008 | 0 | In house | In house | 90 | 0.1 | ||
Schoharie | Schoharie Creek, G CSBI | Schoharie Creek Headwaters | Greene | Town of Hunter | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2010 | 2010 | In house | In house | 300 | 0.34 | ||
Schoharie | Schoharie Creek, Hunter Highway | Schoharie Creek Headwaters | Greene | Town of Hunter | Stormwater and Infrastructure | Locally | GCSWCD | Contract | CWC | No | Completed | 2006 | 0 | NA | In house | 0.93 | |||
Schoharie | Schoharie Creek, JK CSBI | Schoharie Creek | Greene | Town of Hunter | Riparian Buffer Planting | GCSWCD | CSBI | No | Completed | 2011 | 2011 | In house | In house | 250 | 0.14 | ||||
Schoharie | Schoharie Creek, Lexington Culvert | Schoharie Creek | Greene | Town of Lexington | Stormwater and Infrastructure | NYCDEP | GCSWCD | Contract | Other | Yes | Completed | 2007 | 2007 | $218,588 | $160,494 | 340 | 0.12 | ||
Schoharie | Schoharie Creek, Lexington Project 1 | Schoharie Creek | Greene | Town of Lexington | Full Channel Restoration | NYCDEP | GCSWCD | Contract | No | Completed | 1997 | 0 | $218,588 | $160,494 | 340 | 0.12 | |||
Schoharie | Schoharie Creek, Mountain Top Library | Schoharie Creek Headwaters | Greene | Village of Tannersville | Stormwater and Infrastructure | Locally | GCSWCD | SMIP | WRDA | No | Completed | 2010 | 2009 | $561,373 | $44,975 | ||||
Schoharie | Schoharie Creek, S CSBI | Schoharie Creek Headwaters | Greene | Town of Hunter | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2010 | 2010 | In house | In house | 60 | 0.034 | ||
Schoharie | Schoharie Creek, Schoharie Avenue | Schoharie Creek Headwaters | Greene | Village of Hunter | Streambank Stabilization | NYCDEP | GCSWCD | Contract | FEMA | No | Completed | 2008 | 2007 | $461,966 | $195,759 | 180 | 0.12 | ||
Schoharie | Schoharie Creek, Wright SS and Riparian | Schoharie Creek | Greene | Town of Prattsville | Streambank Stabilization | NYCDEP | GCSWCD | Contract | CWC | No | Completed | 2010 | 2008 | $181,679 | $81,679 | 3127 | 3.7 | ||
Schoharie | Schoharie Watershed -Environmental Film Series | Schoharie | Greene | Basin | Education and Outreach | GCSWCD | GCSWCD | SMIP | WAC | No | WAC will host an environmental film series at the Doctorow Center in Hunter on two nights during Schoharie Watershed Month (May, 2011). The films will be water-focused and highlight watershed issues, pollution mitigation, or watershed-foodshed-viewshed topics. A post-screening discussion will be held after each movie. | Completed | 2012 | 2012 | $2,300 | $2,300 | |||
Schoharie | Schoharie Watershed Month, 2013 | Schoharie | Greene | Basin | Education and Outreach | GCSWCD | GCSWCD | SMIP | Multiple | No | The month offers a series of events, activities, and workshops for people of all ages to learn about the Schoharie Watershed, its resources, and programs available for water quality protection | Completed | 2013 | 2013 | $1,700 | $1,700 | |||
Schoharie | Schoharie Watershed Stream Crossing | Schoharie | Greene | Basin | Stormwater and Infrastructure | SWAC Highway Subcommittee | GCSWCD | SMIP | No | A second component to the E/O workshop above is setting aside $50,000 for engineered design services on retainer to work with towns to ensure prioritized culverts are designed properly. | Design | 2011 | $50,000 | $50,000 | |||||
Schoharie | Schoharie Watershed Stream Crossing Workshop | Schoharie | Greene | Basin | Education and Outreach | GCSWCD | GCSWCD | SMIP | No | Develop, design and implement a culvert workshop for local highway depts. that highlights the importance of proper design & installation of culverts for sediment transport, fish passage and incorporates principals using natural channel design for long term stability, protection of water quality and health of streams. | Design | 2011 | $7,600 | $7,600 | |||||
Schoharie | SWAC and Schoharie Watershed Week logos | Schoharie | Greene | Basin | Education and Outreach | SWAC E/O Subcommittee | SMIP | None | No | Branding logos to give an identity to the SWAC and Schoharie Watershed Week. | Completed | 2009 | 2009 | $750 | $750 | ||||
Schoharie | Thermal Refuge Study | Schoharie | Greene | Basin | Planning | SWAC Habitat Subcommittee | GCSWCD | SMIP | USGS | No | This project will assess the thermal profile of the Schoharie Creek and West Kill stream corridors in order to identify potential thermal refuge areas and the characteristics of cold water inputs. This assessment will use thermal imaging data and temperature loggers to provide a baseline characterization of resources. | In Process | 2010 | $52,753 | $52,753 | ||||
Schoharie | Tnorth Settlement Creek, T CSBI | North Settlement Creek | Greene | Town of Ashland | Riparian Buffer Planting | GCSWCD | CSBI | No | Completed | 2011 | 2011 | In house | In house | 400 | 0 | ||||
Schoharie | Town of Hunter Land Use Regulation Review | Schoharie | Greene | Hunter | Planning | Hunter | GCSWCD | SMIP | No | Conduct detailed review of current land use regulations with intent of adopting revisions, new regulations &/or guidelines promoting low impact design, climate smart and smart growth principles. | Design | 2010 | $35,000 | $35,000 | |||||
Schoharie | Water Quality at Home | Schoharie | Greene | Basin | Education and Outreach | GCSWCD | GC CCE | SMIP | GCCCE | No | Implement 3 action-based educational workshops that can be implemented at home as part of raising awareness about stewardship of water quality (will be part of Schoharie Watershed Month 2011) - building rain barrels, holistic pond management, and eco-landscaping (avoid use of chemicals). | Completed | 2011 | 2010 | $2,850 | $2,850 | |||
Schoharie | West Kill SMP | West Kill | Greene | Lexington | Planning | NYCDEP | GCSWCD | Contract | Yes | Stream Management Planning | Completed | 2005 | 2003 | In house | In house | ||||
Schoharie | West Kill, CR 6 | West Kill | Greene | Town of Lexington | Full Channel Restoration | Lexington | GCSWCD | Contract and SMIP | EWP-ESD | No | EWP Project | Completed | 2013 | 2011 | $3,058,120 | $636,280 | 1800 | 6.4 | |
Schoharie | West Kill, Cty Rte 6 Planting | West Kill | Greene | Town of Lexington | Riparian Buffer Planting | Locally | GCSWCD | Contract | No | Completed | 2008 | 2008 | In house | In house | 25 | 0.006 | |||
Schoharie | West Kill, E. | Enochty | West Kill | Greene | Town of Lexington | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | Completed | 2013 | 2013 | 0 | 0 | 100 | 0 | |||
Schoharie | West Kill, Long Road | West Kill | Greene | Town of Lexington | Full Channel Restoration | NYCDEP | GCSWCD | SPDES-Shan | No | Completed | 2009 | 2008 | $1,059,105 | $1,059,105 | 3000 | 19.5 | |||
Schoharie | West Kill, Long Road Irene Repair | West Kill | Greene | Town of Lexington | Full Channel Restoration | NYCDEP | GCSWCD | Contract | FEMA | No | Irene Repair | Design | 2011 | $420,109 | $105,027 | 3000 | 19.5 | ||
Schoharie | West Kill, NYS 42 | West Kill | Greene | Town of Lexington | Streambank Stabilization | Lexington | GCSWCD | Contract | EWP | No | EWP Project | Completed | 2013 | 2011 | $1,057,320 | $264,330 | 1500 | 5.7 | |
Schoharie | West Kill, RAH Stables | West Kill | Greene | Town of Lexington | Full Channel Restoration | NYCDEP | GCSWCD | Contract | Other | No | Completed | 2006 | 2005 | $63,000 | $63,000 | 1600 | 4 | ||
Schoharie | West Kill, Shoemaker Property | West Kill | Greene | Town of Lexington | Full Channel Restoration | NYCDEP | GCSWCD | Contract | No | Completed | 2005 | 2004 | $657,065 | $657,065 | 3086 | 6.6 | |||
Schoharie | West Kill, Shoemaker Property Irene Repair | West Kill | Greene | Town of Lexington | Full Channel Restoration | NYCDEP | GCSWCD | Contract | FEMA | No | FEMA Repair | Design | 2011 | $705,706 | $176,427 | 3086 | 6.6 | ||
Schoharie | West Kill, V CSBI | West Kill | Greene | Town of Lexington | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | WRDA | No | Completed | 2010 | 2010 | In house | In house | 590 | 0.54 | ||
Schoharie | Wet Meadow: Interpretive Kiosk and Brochures | Schoharie | Greene | Tannersville | Education and Outreach | Mtn Top Arboretum | GCSWCD | SMIP | Private | No | The Mountain Top Arboretum continues to develop their educational self guided tour and brochures program, and this grant proposal builds on that effort to develop an educational kiosk in this natural undisturbed meadow and three color brochures highlighting different aspects of a riparian area. The brochures will be available at the kiosk, and trails will be marked with numbered posts that relate to the featured information in the brochure. Applicant wants to use funds to convey water quality benefits of meadows and wetlands to the public and students. | Completed | 2010 | 2009 | $6,460 | $6,460 | |||
Schoharie | Windham Golf Club | Batavia Kill | Greene | Town of Windham | Streambank Stabilization | GCSWCD | Contract | Private | No | Design/Oversight | 2012 | 2012 | |||||||
Schoharie | Windham Landfill Road Repair | Batavia Kill | Greene | Town of Windham | Stormwater and Infrastructure | NYCDEP | GCSWCD | Contract | FEMA | No | FEMA Repair | Completed | 2011 | 2011 | $4,463 | $1,116 | 1,280 | 0.53 | |
Schoharie | Windham Path | Windham Path | Batavia Kill | Greene | Town of Windham | Riparian Buffer Planting | NYCDEP | GCSWCD | CSBI | Completed | 2013 | 2013 | 0 | 0 | 1870 | 3 | |||
Schoharie | Woodland Walk Outdoor Classroom | Schoharie | Greene | Tannersville | Education and Outreach | Mtn Top Arboretum | GCSWCD | SMIP | Private | No | Create design plans for an accessible outdoor classroom that would accommodate approximately 45 people for year-round outdoor programming on a range of ecological and natural history topics relating to the watershed (wetland plants, insects & wildlife along riparian area, leaf pack workshops to learn about geology, birding and stream health | Completed | 2011 | 2010 | $6,810 | $6,810 |